HOA Architectural Review Form: Template and Tips

A free HOA architectural review form you can copy, what to attach, how the committee reviews it, and what state law can require in a denial.

HOAlyst Team · · 7 min read

The HOAlyst owner portal in a web browser, where an owner submits and follows an architectural request

An HOA architectural review form (also called an architectural request, ARC application or design review application) is the form an owner fills out to ask the association for approval before changing the outside of their home: a fence, deck, paint color, roof, shed, solar panels, pool or landscaping. A good form asks for the owner and property, a clear description of the project, where it goes, its size, materials and colors, who will build it and when, and the plans and photos the committee needs to decide. Below is a form you can copy, what to attach, and how the review usually works.

Architectural control is one of the main reasons owners interact with their association at all. The Foundation for Community Association Research estimates there are 373,000 community associations in the U.S., and most of them have some form of design standards in their declaration. A clear form saves the committee from chasing missing details and gives the owner a faster answer.

This article is general information, not legal advice. Your association's governing documents (the declaration or CC&Rs, the bylaws, and any architectural guidelines the declaration authorizes) decide what needs approval, who reviews it, how long the association has to respond, and what happens if it does not. State law can add rules of its own. Where we quote a statute, it is an example from one state. Ask your association's attorney before adopting new guidelines or denying a request you expect to be challenged.

What needs architectural approval

Start with the declaration. Most require approval for any change to the exterior of a home or lot that neighbors can see. Common examples:

  • Fences, walls and gates.
  • Decks, patios, pergolas and screened porches.
  • Exterior paint colors, siding, doors and windows.
  • Roof replacement, especially a change of material or color.
  • Sheds, playsets, additions and garages.
  • Pools, hot tubs and their fencing.
  • Landscaping changes, tree removal, driveways and hardscape.
  • Solar panels, generators and other equipment, within the limits state law sets.

Many associations publish a short list of changes that never need approval, such as repainting in the same approved color or replacing plants like for like. Publishing that list cuts the number of requests and the number of violations.

HOA architectural review form template

Adapt this to your documents. Copy it into Word or a fillable PDF, and replace each bracketed item:

  • [Association name] Architectural Review Request. Request number: [assigned by the association].
  • Owner name, property address, phone and email.
  • Project type: fence / deck or patio / paint / roof / landscaping / shed / solar / pool / addition / other: [describe].
  • Location on the lot: front yard / backyard / side yard / roof / driveway / full exterior.
  • Description of the work, in plain words: [what you will build or change, and why].
  • Dimensions: [length, width, height, and distance from property lines].
  • Materials: [for example, composite decking, cedar pickets, architectural shingles].
  • Color or finish: [manufacturer, color name and number; attach a sample or photo].
  • Contractor name and license number, if any: [name, license].
  • Estimated start and completion dates: [dates].
  • Attachments: site plan or survey showing the location, drawings or product sheets, and photos of the area as it is today.
  • Owner acknowledgment: "I have read the architectural guidelines. I understand that approval covers only the work described here, that work may not start until I receive written approval, and that approval does not replace any permit or code requirement."
  • Owner signature and date.

Leave room on the form, or in a separate section, for the committee to record the date received, the decision, any conditions and the reason for a denial.

What to attach so the committee can decide

Most delays come from missing information, not from denials. Ask for these up front:

  • A site plan or a marked-up copy of the survey showing exactly where the work goes and its distance from the lot lines.
  • Drawings, a product brochure or a manufacturer spec sheet showing the design.
  • Color samples or the manufacturer color name and number.
  • Photos of the current house or yard where the work will happen.
  • For fences and additions, the height and which side faces outward.

Some associations also ask for neighbor acknowledgment signatures. Check your documents before requiring one: an acknowledgment shows neighbors were told, but in most associations it is the committee, not the neighbors, that decides.

How the architectural review process usually works

  • The owner submits the form and attachments.
  • The manager or committee chair checks that it is complete and asks for anything missing.
  • The committee reviews it against the declaration and the published guidelines, often at a scheduled meeting or by each member recording a review.
  • The committee decides: approve, approve with conditions, ask for more information, or deny.
  • The owner gets the decision in writing, with any conditions and, for a denial, the reason.
  • After the work is done, some associations inspect to confirm it matches what was approved.

Check your declaration for a response deadline. Many say a request is deemed approved if the association does not answer within a set period, which makes a missed deadline costly. Track the date each complete request arrived, and treat a request for more information the way your documents do, since some restart the clock and some do not.

Example: Florida homeowners' associations

Florida sets several limits on architectural review in homeowners' associations. An association or its architectural committee may review plans for the location, size, type or appearance of an improvement only to the extent that authority is specifically stated or reasonably inferred in the declaration or in published guidelines the declaration authorizes, and it must reasonably and equitably apply those standards to all owners (Fla. Stat. § 720.3035(1)(a)). It may not regulate an interior that cannot be seen from the frontage, an adjacent parcel, common area or a community golf course, and it may not require a building permit as a condition of reviewing a request (Fla. Stat. § 720.3035(1)(b)-(c)).

If the association denies a request, Florida requires written notice stating with specificity the rule or covenant relied on and the specific part of the proposed improvement that does not conform (Fla. Stat. § 720.3035(4)(a)). If the documents give owners options for materials, size, design or location, the association may not restrict an owner's choice among them (Fla. Stat. § 720.3035(2)). The same section requires boards to adopt hurricane protection specifications and bars denying an application that conforms to them (Fla. Stat. § 720.3035(6)).

Florida also protects solar. A covenant or declaration may not prohibit or have the effect of prohibiting solar collectors on buildings in the community, though the association may decide where on the roof they go, within an orientation to the south or within 45 degrees east or west of due south, as long as that does not impair their effective operation (Fla. Stat. § 163.04(2)).

Example: Virginia

Virginia's Property Owners' Association Act takes a narrower approach to solar. An association may not prohibit an owner from installing a solar energy collection device on their property unless the recorded declaration establishes such a prohibition, but it may set reasonable restrictions on the size, place and manner of placement (Va. Code § 55.1-1820.1(B)). If your state has rules like these, your form and guidelines should reflect them, so owners are not asked for approvals the association cannot withhold.

Writing the decision letter

Every decision should be in writing, even an approval. A good decision letter states what was approved, by reference to the request number and attachments; any conditions, written as specific requirements ("finished side of the fence faces outward"); how long the approval is good for if your documents set a limit; and that approval does not replace permits or code requirements. A denial should cite the exact guideline or covenant section and say which part of the project does not meet it, so the owner can revise and resubmit. That is what Florida requires, and it is good practice everywhere.

Decide architectural requests the same way every time. Inconsistent approvals are the most common reason an architectural violation does not hold up later. If a project is built without approval, the next step is usually a violation notice; our HOA violation letter template and guide to the HOA fine hearing cover that process, and our HOA meeting minutes guide covers how to record committee decisions.

Where HOAlyst fits

In HOAlyst, owners submit an architectural request from the owner portal or mobile app with a step-by-step form: project type, location, description, dimensions, materials, color, contractor and dates, then photos and plans, and an acknowledgment of the rules. Drafts save as they go. Committee members each record a review, and the board records the decision (approve, approve with conditions, request more information or deny) with written conditions and a decision letter, which a denial must include. The owner sees the status, the conditions and the letter in their portal. See what boards get or try the demo with a sample association.

Architectural review checklist

  • Declaration and guidelines checked: what needs approval, who reviews, the response deadline and any deemed-approval rule.
  • State law checked for limits such as solar, hurricane protection, interior work and denial notices.
  • Form asks for project type, location, description, dimensions, materials, color, contractor and dates.
  • Site plan, drawings or product sheets, color samples and current photos attached.
  • Date the complete request arrived recorded, and missing items requested in writing.
  • Committee reviews against the written guidelines, the same way for every owner.
  • Written decision sent, with conditions or the specific reason for a denial.
  • Completed work inspected where your documents allow, and the file kept.

This article is general information for community association boards, not legal advice. Laws differ by state and change over time, and your association's declaration, bylaws and rules may set different requirements. Check your governing documents, and ask your association's attorney before acting on a specific situation.